Events Calendar

12.03.13, 1 Day

G59/2 Connecting Large Scale Embedded Generators

Offices of Narec Distributed Energy, Blyth

This 1 day course covers the connection of large scale embedded generators to the distribution network. It is suitable for contractors installing solar PV systems and small wind turbines up to around 100kW.

The course will cover the following topics:

- Introduction to the UK electrical power distribution system

- Role of the District Network Operators (DNOs)

- Network issues caused by embedded generation

- Scope of G83/1 Stage 1 and 2

- Applicability of G59/2

- Technical requirements of G59/2

- Connection application process

- Witness testing requirements

- DNO Case Studies (where available)


Candidate Entry Requirements

Although no strict entry requirements exist, electrical background is recommended.

To register for this event please contact Leanne on 0191 374 0233 or leanne@cene.org.uk

Duration: 1 Day
Accreditation: Narec
Venue: Narec, Blyth

Cost: £250+VAT (CENE members receive a 5% discount)

Booking Enquiry

To make a booking enquiry, please enter your details below

Name:
Email:
Telephone:
Your Enquiry:

back to events calendar